Skip to content
In forceTransport and rural areas

Wind turbine energy park at Bolle Enge

Official title (in Danish): Bekendtgørelse om en energipark ved Bolle Enge i Brønderslev Kommune

Executive order · BEK nr. 645 af 06.07.2026 · By-, Land- og Trans­port­min­is­ter­iet

In short

Reading time: 1 min
  • What it sets out:
    • An area at Bolle Enge in Brønderslev Municipality is an energy park.
    • The area is shown in annex 1.
    • The purpose is to promote the installation of wind turbines.
    • Wetlands on low-lying land (low-lying soil) and technical installations may still be planned.
  • When: The executive order entered into force on 11 July 2026.

Written by AI from verbatim quotes from the source and checked by code and AI. Dates, tables and the fact box are calculated by fixed rules. Unofficial translation. Always read the original.

Sources and original

Read the official text (in Danish) →

Source: Retsinformation.dk

Translated from Danish · The Danish version and the original source apply.

Timeline

How to read the timeline

  • Filled dot: this has happened. The date and the source are shown below the point.
  • Empty dot: an upcoming step. The date may be known or not known yet.
  • Square: the case ended here, e.g. because the bill was rejected or withdrawn.
  • "The date is in the source, but entry into force has not been confirmed yet" (or just "not confirmed yet") means the date has passed, but the source does not yet show that the law or rule has entered into force. We only change the status when the source confirms it.
  1. Issued · 6 July 2026
  2. Published in the Danish Law Gazette (Lovtidende) · 10 July 2026
  3. In force · 11 July 2026