Rules for energy park near Nørre Nebel

Official title (in Danish): Bekendtgørelse om en energipark ved Nørre Nebel i Varde Kommune

Executive order · BEK nr. 649 af 06.07.2026 · By-, Land- og Trans­port­min­is­ter­iet

In short

Reading time: 1 min
  • What it sets out:
    • The executive order designates an area near Nørre Nebel in Varde Municipality as an energy park for wind turbines and solar power plants.
    • Solar power plants must, as a general rule, be at least 150 metres from villages, summer house areas and allotment areas, and 150–750 metres from homes.
  • Who: The distance rules apply to the planning of solar power plants on the designated area. The municipality does the planning, and the rules protect neighbours of the plants, especially owners and tenants of homes.
  • When: The executive order entered into force on 11 July 2026.

Written by AI from verbatim quotes from the source and checked by code and AI. Dates, tables and the fact box are calculated by fixed rules. Unofficial translation. Always read the original.

Sources and original

Read the official text (in Danish) →

Source: Retsinformation.dk

Translated from Danish · The Danish version and the original source apply.

Timeline

How to read the timeline

  • Filled dot: this has happened. The date and the source are shown below the point.
  • Empty dot: an upcoming step. The date may be known or not known yet.
  • Square: the case ended here, e.g. because the bill was rejected or withdrawn.
  • "The date is in the source, but entry into force has not been confirmed yet" (or just "not confirmed yet") means the date has passed, but the source does not yet show that the law or rule has entered into force. We only change the status when the source confirms it.
  1. Issued · 6 July 2026
  2. Published in the Danish Law Gazette (Lovtidende) · 10 July 2026
  3. In force · 11 July 2026